Groundwater Specialists

Established in 1980, Boegman Borehole Testing (BBT) pioneered the use of submersible pumps for pump testing.

Exploration

We site new borehole drill sites utilizing scientific methodology combined with “old school” methods to optimize success.

Camera Logging

High quality borehole camera is used to inspect boreholes and report on findings.Applications include:

  • Geology
  • Borehole Construction Problems
  • Lost equipment salvage assist
  • Pollution ingress identification

Consulting

With 40 years field experience there are few groundwater scenarios that we have not experienced.

We share this knowledge by consulting in: 

  • Sustainable Yield estimation pump testing
  • High efficiency pumping solutions
  • Drill operation supervision and logging
  • Environmental water use compliance
  • Dewatering
  • Solar Driven pumping solutions

Recent Projects

9

Pump Testing

Pump Testing of all the boreholes within the Kruger national Park, 1984 to 1994.

Pump testing for dewatering on the Gautrain Project.

Pump testing of two massive supply boreholes in Djelfa Algeria

9

Pre-Mining Test

Pre-mining environmental impact studies and water supply pump testing done for several large scale platinum mines in Pilansberg, Zebowa, Steelpoort and Polokwane.
9

Hands-On Training

Hands on training for personnel in Abu Dhabi for a project requiring the testing of 2000 boreholes.

About Us

Our company consists of multiple testing vehicles separating us as one of the only South African based companies able to handle most testing projects for yields up to 200 000 litres per hour.

At Boegman groundwater we love challenges and we have pioneered most of the industry methods used today for pump testing.

Get A Free Quote